跳到主要內容

簡易檢索 / 詳目顯示

研究生: 陳維倫
Chen, Wei-Lun
論文名稱: 數據相關之二階製程管制
Two-step Process Control for Autocorrelated data
指導教授: 楊素芬
學位類別: 碩士
Master
系所名稱: 商學院 - 統計學系
Department of Statistics
論文出版年: 2001
畢業學年度: 89
語文別: 英文
論文頁數: 103
外文關鍵詞: autocorrelated, transfer model
相關次數: 點閱:194下載:43
分享至:
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報

  • Most products are produced by several process steps and have more than one interested quality characteristics. If each step of the process is independent, and the observations taken from the process are also independent then we may use Shewhart control chart at each step. However, in many processes, most production steps are dependent and the observations taken from the process are correlated. In this research, we consider the process has two dependent steps and the observations taken from the process are correlated over time. We construct the individual residual control chart to monitor the previous process and the cause-selecting control chart to monitor the current process. Then simulate all the states occur in the process and present the individual residual control chart and the cause-selecting control chart of the simulations. Furthermore compare the proposed control charts with the Hotelling T2 control chart. At last, we give an example to illustrate how to construct the proposed control

    From the proposed control charts, we can determine which step of the process is out of control easily. If there is a signal in the individual residual control chart, it means the previous process is out of control. If there is a signal in the cause-selecting control chart, it means the current process is out of control. The Hotelling T2 control chart only indicate the process is out of control but does not detect which step of the process is out of control.

    封面頁
    證明書
    致謝詞
    論文摘要
    目錄
    表目錄
    圖目錄
    1. INTRODUCTION
    2. THE PROCESS MODEL
    2.1 Assumptions and Notation
    2.2 The Possible Distribution of Xt and Yt
    2.3 Process Control for the Previous and Current process
    2.3.1 Establish the Individual Residual Chart to Monitor the Previous Process
    2.3.2 Establish the Cause-Selecting Control Chart to Monitor the Current Process
    2.4 Type I, Type II Error Probabilities and the Power of the Propose Control Chart
    3. Simulation Study and An Empirical Example
    3.1 Simulate 9 Process States
    3.1.1 Simulate state 1 in the process
    3.1.2 Simulate state 2 in the process
    3.1.3 Simulate state 3 in the process
    3.1.4 Simulate state 4 in the process
    3.1.5 Simulate state 5 in the process
    3.1.6 Simulate state 6 in the process
    3.1.7 Simulate state 7 in the process
    3.1.8 Simulate state 8 in the process
    3.1.9 Simulate state 9 in the process
    3.2 An Empirical Example
    3.3 Comparison the proposed control chart and Hotelling T2 control chart
    4. CONCLUSION
    5. REFERENCES
    6. APPENDICES
    Appendix 1 (the empirical data to build the proposed charts)
    Appendix 2 (the empirical data to build the proposed charts)
    Appendix 3 (the S-plus program to count ARL for the simulated 9 states data)

    Alwan, L. C and Roberts, H. V. (1988),“Time-Series Modeling for Statistical Process Control ”. Journal of Business & Economic Statistics, Vol, 6, pp87-95.
    Alwan, L. C. (1992)“Effects of Autocorrelation on Control Chart Performance” Communications in Statistics-Theory, Vol.21(4) ,pp1025-1049.
    Box, G. E. P and Jenkins, G. M. (1976) “Time Series Analysis: Forecasting and Control ”(Revised edition), Holden Day, San Francisco.
    Gnandesikan, R. (1977) “Methods for Statistical Analysis of Multivariate Observation”Wiley, New York.
    Hu, J. S. and Roan, C. (1996), “Changes Patterns of Time Series-Based Control Charts”. Journal of Quality Technology, Vol.28, pp302-312.
    Johnson, N. and Wichern, D,“Applied Multivariate Statistical Analysis” Prentice-Hall, Englewood Cliffs, N.J.
    Montgomery, D. C. and Mastrangelo, G. M. (1991),“Some Statistical Process Control Methods for Autocorrelated Data”. Journal of Quality Technology, Vol.23, pp179-204.
    Peter, J. B and Richard, A. D. (1996)“Introduction to Time Series and Forecasting”
    Tsay, R. S. and Tiao, G. C. (1985) "Use of canonical analysis in time series modelidentification", Biometrika, Vol.72, pp299-315.
    Vasilopoulos, A. V. and Stamboulis, A. P. (1978), “Modification of Control Chart Limits in the Presence of Data Correlation”, Journal of Quality Technology, Vol.10, pp20-30.
    Wardell, D. G., Moskowitz, H., and Plante, R. D. (1992),“Control Charts in the Presence of Data Correlation”, Management Science Vol.38, pp1084-1105.
    Wardell, D. G., Moskowitz, H., and Plante, R. D. (1994),“Run-Length Distributions of Special-Cause Control Charts for Correlated Process”. Technometrics, Vol.36, pp3-17.
    Wardell, Wade, R. and Woodall, W. (1993), “ A Review and Analysis of Cause-Selecting Control Charts”. Journal of Quality Technology, Vol.25, pp 161-169.
    Wei Jiang, Tsui K-L and Woodall, W. (2000), “A New SPC Monitoring Method: The ARMA Chart” Technometrics Vol.42,pp399-410.
    吳柏林(Wu, 1995).“時間數列分析導論” 華泰書局出版
    林茂文(Lin, 1992).“時間數列分析與預測”華泰書局出版
    葉小蓁(Yeh, 1998).“時間序列分析與應用”

    QR CODE
    :::